Heating and Ventilating Ductwork Planning & Installation.
As with the Level 2 qualification, the Level 3 is based on the National Occupational Standards (NOS) and covers installing, testing, inspecting and cleaning industrial and commercial heating and ventilating ductwork systems.
Curriculum
- 8 Sections
- 79 Lessons
- Lifetime
Expand all sectionsCollapse all sections
- Unit 1Apply Health and Safety and Environmental Legislation in the Building Services Engineering Sector13
- 1.1K1 – Industry Standards & Regulations
- 1.2K2 – Your responsibilities
- 1.3K3 – Working practices
- 1.4K4 – Harmful materials & substances
- 1.5K5 – Organisational procedure requirements
- 1.6K6 – Harmful materials & substances procedures
- 1.7K7 – Health & safety information
- 1.8K8 – Hazards & risks
- 1.9K9 – Handling hazardous materials & substances
- 1.10K10 – Safe use, maintenance, handling, transport & storage
- 1.11K11 – Warning signs
- 1.12K12 – Waste material, substances & liquids
- 1.13K13 – Reporting issues
- Unit 2Establish and Maintain Relationships in the Building Services Engineering Sector9
- 2.1K1 – Customer service
- 2.2K2 – Technical & functional info
- 2.3K3 – Technical & functional info sources
- 2.4K4 – Supplying information
- 2.5K5 – Implications of providing info
- 2.6K6 – Handover & demo of a BSE system
- 2.7K7 – Knowledge of a BSE system
- 2.8K8 – Establishing positive relations
- 2.9K9 – Working requirements & practices
- Unit 3Coordinate a Work Site in the Building Services Engineering Sector8
- Unit 4Perform Electrical Work on Mechanical Building Services Systems12
- 5.1K1 – Responsibility limitations
- 5.2K2 – Electrical supplies
- 5.3K3 – Electrical equipment
- 5.4K4 – Standards & regulations
- 5.5K5 – Job info & documentation
- 5.6K6 – Risk assessment & method statement
- 5.7K7 – Selecting electrical equipment
- 5.8K8 – Diagrams & drawings
- 5.9K9 – Disconnecting, installing & connecting
- 5.10K10 – Functional testing
- 5.11K11 – Electrical faults
- 5.12K12 – Organisational procedures
- Unit 5Install and Test Industrial and Commercial Heating and Ventilating Ductwork Systems14
- 7.1K1 – Details of different systems
- 7.2K2 – System equipment
- 7.3K3 – Installing & testing systems
- 7.4K4 – Job info & documentation
- 7.5K5 – Risk assessment & method statement
- 7.6K6 – Equipment, components & accessories
- 7.7K7 – Diagrams & drawings
- 7.8K8 – Organisational procedures
- 7.9K9 – Fitting, fixing and connecting
- 7.10K10 – Test procedures
- 7.11K11 – Safety & control features
- 7.12K12 – Cleaning a system
- 7.13K13 – Organisational procedures
- 7.14K14 – Implementing organisational procedures
- Unit 6Inspect and pre-commission industrial and commercial heating and ventilating systems6
- Unit 7Commission Industrial and Commercial Heating and Ventilating Systems11
- 10.1K1 – Operation, applications, advantages & limitations of systems
- 10.2K2 – Industry standards & regulations
- 10.3K3 – Job information & documentation
- 10.4K4 – Risk assessment & method statement
- 10.5K5 – Checks
- 10.6K6 – Diagrams & drawings – services
- 10.7K7 – Diagrams and drawings – equipment
- 10.8K8 – System commissioning
- 10.9K9 – Testing
- 10.10K10 – Commissioning & adjusting
- 10.11K11 – Organisational procedures
- Unit 8Decommission Industrial and Commercial Heating and Ventilating Systems6