Heating and Ventilating Ductwork Planning & Installation.
As with the Level 2 qualification, the Level 3 is based on the National Occupational Standards (NOS) and covers installing, testing, inspecting and cleaning industrial and commercial heating and ventilating ductwork systems.
-
Unit 1
Apply Health and Safety and Environmental Legislation in the Building Services Engineering Sector
- K1 – Industry Standards & Regulations
- K2 – Your responsibilities
- K3 – Working practices
- K4 – Harmful materials & substances
- K5 – Organisational procedure requirements
- K6 – Harmful materials & substances procedures
- K7 – Health & safety information
- K8 – Hazards & risks
- K9 – Handling hazardous materials & substances
- K10 – Safe use, maintenance, handling, transport & storage
- K11 – Warning signs
- K12 – Waste material, substances & liquids
- K13 – Reporting issues
-
Unit 2
Establish and Maintain Relationships in the Building Services Engineering Sector
- K1 – Customer service
- K2 – Technical & functional info
- K3 – Technical & functional info sources
- K4 – Supplying information
- K5 – Implications of providing info
- K6 – Handover & demo of a BSE system
- K7 – Knowledge of a BSE system
- K8 – Establishing positive relations
- K9 – Working requirements & practices
-
Unit 3
Coordinate a Work Site in the Building Services Engineering Sector
-
Unit 4
Perform Electrical Work on Mechanical Building Services Systems
- K1 – Responsibility limitations
- K2 – Electrical supplies
- K3 – Electrical equipment
- K4 – Standards & regulations
- K5 – Job info & documentation
- K6 – Risk assessment & method statement
- K7 – Selecting electrical equipment
- K8 – Diagrams & drawings
- K9 – Disconnecting, installing & connecting
- K10 – Functional testing
- K11 – Electrical faults
- K12 – Organisational procedures
-
Unit 5
Install and Test Industrial and Commercial Heating and Ventilating Ductwork Systems
- K1 – Details of different systems
- K2 – System equipment
- K3 – Installing & testing systems
- K4 – Job info & documentation
- K5 – Risk assessment & method statement
- K6 – Equipment, components & accessories
- K7 – Diagrams & drawings
- K8 – Organisational procedures
- K9 – Fitting, fixing and connecting
- K10 – Test procedures
- K11 – Safety & control features
- K12 – Cleaning a system
- K13 – Organisational procedures
- K14 – Implementing organisational procedures
-
Unit 6
Inspect and pre-commission industrial and commercial heating and ventilating systems
-
Unit 7
Commission Industrial and Commercial Heating and Ventilating Systems
- K1 – Operation, applications, advantages & limitations of systems
- K2 – Industry standards & regulations
- K3 – Job information & documentation
- K4 – Risk assessment & method statement
- K5 – Checks
- K6 – Diagrams & drawings – services
- K7 – Diagrams and drawings – equipment
- K8 – System commissioning
- K9 – Testing
- K10 – Commissioning & adjusting
- K11 – Organisational procedures
-
Unit 8
Decommission Industrial and Commercial Heating and Ventilating Systems
-
Unit 9
Clean Industrial and Commercial Ventilation Systems
- K1 – Systems
- K2 – Ductwork
- K3 – Working environment
- K4 – Industry standards and regulations
- K5 – Job information and documentation
- K6 – Risk assessment & a method statement
- K7 – Storage
- K8 – Work area prep
- K9 – Diagrams & drawings
- K10 – Organisational procedures
- K11 – Isolation & reinstatement
- K12 – Access
- K13 – Installation
- K14 – Cleaning – materials & equipment
- K15 – Cleaning – methods
- K16 – Grease
- K17 – Cleanliness recording
- K18 – Additional work
- K19 – Waste material